Commercieel Datacenter in the Nordics

THE CHALLENGE

Complete white space design to be realized in a very short time with a logistic challenge related to overseas location.

OUR SOLUTION

Through meticulous planning, all parts have been collected in our warehouse to reach the remote location in 1 transport and the following products and services have been installed and executed:

  • 90 racks installed;
  • All necessary cable trays mounted;
  • Redundant Meet Me Room connections realized;
  • 90 tap-off boxes installed;
  • Cooling Alley’s mounted in front of all racks;
  • All customer specific rack PDUs installed;
  • 90 power cable ducts and 90 KoldLoks mounted;
  • Installation of the cage;
  • More than 1000 blind panels mounted;
  • 2 humidification systems installed;
  • 60 adjustable air supply tiles installed;
  •  2 custom made UPS-Cooling Alley’s designed and installed.

THE Result

Our datacenter team of field engineers and project leaders have realized the complete installation of the datacenter room within 3 weeks, in accordance with all requirements, wishes and expectations of the customer.

 