THE CHALLENGE
Complete white space design to be realized in a very short time with a logistic challenge related to overseas location.
OUR SOLUTION
Through meticulous planning, all parts have been collected in our warehouse to reach the remote location in 1 transport and the following products and services have been installed and executed:
- 90 racks installed;
- All necessary cable trays mounted;
- Redundant Meet Me Room connections realized;
- 90 tap-off boxes installed;
- Cooling Alley’s mounted in front of all racks;
- All customer specific rack PDUs installed;
- 90 power cable ducts and 90 KoldLoks mounted;
- Installation of the cage;
- More than 1000 blind panels mounted;
- 2 humidification systems installed;
- 60 adjustable air supply tiles installed;
- 2 custom made UPS-Cooling Alley’s designed and installed.
THE Result
Our datacenter team of field engineers and project leaders have realized the complete installation of the datacenter room within 3 weeks, in accordance with all requirements, wishes and expectations of the customer.